Topchampion 赛冠工业自动化HomeSolutionsEngineeringCase studiesProductsInsightsRequest a quote中文English

Vacuum Sewerage System

The TC-VACUUM vacuum sewer system collects wastewater through collection chambers and shallow vacuum mains. Liquid-level valves operate without local power. A central station uses pumps, PLC and HMI controls to maintain vacuum and discharge wastewater.

Model: TC-VACUUM

Vacuum Sewerage System

Request a quote

Distributed collection. Central vacuum transfer.

A vacuum sewer system collects wastewater from sources spread across a site. Short gravity pipes carry it to terminal chambers. When the liquid level rises, a pilot opens the interface valve. Wastewater enters first, followed by air. The mixture moves through vacuum mains to a central collection vessel. Discharge pumps then send the wastewater to a sewer or treatment plant. Chamber options include the buried HDPE TCMVB-PE450 and the surface-mounted stainless steel TCMVB-M. Interface valves are available as TCMV-De50, TCMV-De63 and TCMV-De80. Control components include the TCVP-15 pressure-actuated pilot, TCVS-20 vacuum relief valve and TCVF-X float-actuated pilot. Combined valve-and-pilot models are TCMV-De50P, TCMV-De63P and TCMV-De80P. Typical sites include rural and existing communities, commercial developments, basements, rail facilities and dispersed sanitary facilities. To select a system, check the wastewater type, flow rate, ground levels and pipe route. The downstream connection also matters. Typical burial depth is 0.5–1.2 m. Pipe slopes, lifts and spacing need a hydraulic design for the site. Terminal valves work without electricity. The vacuum system and discharge pumps need power at the central station. The system image is an AI-assisted concept illustration. It is not a construction drawing.

  • Level-actuated terminal valves operate without local power; the central station is powered.
  • Shallow vacuum mains and designed lifts accommodate constrained routes and levels.
  • PLC and HMI control with optional 4G / IoT monitoring integration.
  • Models, connections, capacity and standby strategy follow the project specification.

Specifications

Station service scaleReference: 50–1000 properties, collection radius up to 3 km; verify hydraulics
Station design vacuumReference maximum vacuum: -0.75 bar
Typical main burial depthReference: 0.5–1.2 m, subject to site design
ControlAutomatic PLC control + HMI
Communication4G / IoT platform integration, project-specific
Reference power supplyAC 380 V, three-phase, five-wire; confirm export voltage and frequency
Collection vessel materialFRP / coated carbon steel / SUS304
Control cabinet protectionIP55, subject to configuration
Station installationSemi-buried, factory-prefabricated assembly
Buried HDPE chamberTCMVB-PE450: HDPE; reference Ø450 × 1200 mm; 2–4 properties per chamber
Surface-mounted chamberTCMVB-M: SUS304; reference L700 × W400 × H600 mm
Chamber reference flow2–6 L/min; verify actual capacity for the project
Power-free interface valveTCMV-De50 / TCMV-De63 / TCMV-De80; -80 kPa reference vacuum, trigger threshold by model
Pressure-actuated pilotTCVP-15; manual / automatic; reference trigger pressure 1.5 kPa
Power-free vacuum relief valveTCVS-20; opening -15 to -25 kPa; closing -35 to -42 kPa (reference)
Float-actuated pilotTCVF-X; manual / automatic; level setpoint by configuration
Integrated interface valveTCMV-De50P / TCMV-De63P / TCMV-De80P; integrated valve and pilot
Chamber reference connectionsTCMVB-PE450: 6 / 8 in socket inlet, 2 in flanged outlet; TCMVB-M: 4 in threaded inlet, 2 in threaded outlet

Catalogue reference values only. Final selection follows project hydraulics, the agreed specification and approved drawings. Imperial values are approximate conversions. Station design vacuum and terminal valve operating pressure are separate specifications; De and DN are not interchangeable.

Configured for site conditions and the agreed specification.

For a quotation, provide the number of properties, average and peak flow, wastewater characteristics and temperature, site levels, routing, underground obstructions, downstream discharge point and head, station area, power supply and service access. These inputs define station capacity, pump type and standby strategy, chamber materials and connections, pipe sizes and lift sections, valve operating vacuum and level setpoints. PLC / HMI, communication protocols, remote permissions and alarm logic are agreed for the project. Supply scope, ratings, connection standards, installation responsibilities, lead time and acceptance criteria follow the approved technical specification and drawings. De and DN are not interchangeable; confirm each valve model, bore and connection. Voltage, frequency and applicable electrical requirements for North American projects require separate confirmation.

Chinese Brochure

English Brochure