Topchampion 赛冠工业自动化HomeSolutionsEngineeringCase studiesProductsInsightsRequest a quote中文English

We design and build Precision Automation and Electrical Systems

We build industrial automation and power distribution systems for tire plants, semiconductor fabs, power stations, EV plants and data centers. Our scope includes conveyor equipment, PLC controls, control cabinets and SCADA/MES interfaces. Factories and offices in Kunshan, Huai An and Vietnam support projects in 18+ countries.

20

Years in Business · since 2005

4

Global Sites & Offices

18+

Countries Served

50+

Annual 40HQ Containers Shipped

Solutions

Plan the production line, power distribution and plant data together. Topchampion combines conveyor equipment, electrical controls and software for industrial process automation. We define the scope of each part before design starts.

Multi-level spiral roller conveyor system in a factory

Automation Equipment

Tire & rubber production lines, robotic cells, conveyor PLCs and equipment control cabinets — for Goodyear, Pirelli, Sumitomo, Cooper Chengshan.

Control System Hardware Integration

Control system integration connects PLC hardware, field interfaces and industrial networks for generator, semiconductor utility and water-treatment projects.

Software Development

SCADA, HMI and MES gateway development for tire, semiconductor, data-center and gen-set platforms.

Send a layout, equipment list or short process brief. Include the site, power supply, target line speed and preferred controls. We can then review the scope and explain what else is needed for a quote.

Discuss your project

News from us

Explore insights

Certifications

ISO 9001 Quality Certificate

ISO 9001 Quality Certificate

ABB Partnership

ABB Partnership

Rittal Partnership

Rittal Partnership

Rockwell Certificate

Rockwell Certificate

Frequently asked questions

What is an MCC?

An MCC (Motor Control Center) controls and protects several electric motors. A lineup can contain feeders, starters, variable-frequency drives, protection devices and control interfaces. The layout provides access for maintenance.

What is a PCC?

A PCC (Power Control Center) distributes electrical power to major plant loads. It commonly handles higher-current incoming and outgoing feeders than an MCC. Its main role is power distribution and protection.

Can Topchampion export control cabinets to the USA?

Yes. We review the assembly and destination requirements for North American projects, including specified components, SCCR, labels and documentation. The applicable standard and approval route must be agreed before manufacture. Requirements such as UL 891 or UL 508A depend on the equipment type and project scope; confirm the required certification with the engineering team.

Can you provide FAT?

Yes. Factory Acceptance Testing (FAT) checks the equipment against an agreed test plan before shipment. The scope can include visual and wiring inspections, electrical tests, functional simulation, PLC/HMI checks and communications tests. Test conditions, customer witness points and records are confirmed for the project.

Which industries do you serve?

Topchampion serves tire and rubber manufacturing, semiconductor and FPD facilities, automotive and EV plants, gas and diesel power generation, data centers, healthcare, rail transit, and other industrial infrastructure.

What equipment is inside a control cabinet?

A control cabinet can contain a main isolator, circuit breakers, contactors, drives, a control power supply, PLC I/O and terminal blocks. The mix depends on the machines and functions it serves. The layout also needs space for wiring, heat dissipation and maintenance. We review the component list and drawings for the application before confirming a control panel configuration.

How is the enclosure housing selected?

Start with the installation environment: indoor or outdoor use, ambient temperature, dust, moisture and possible corrosion. These conditions affect the enclosure material, sealing, cooling and cable-entry arrangement. Tell us about cleaning methods, space limits and maintenance access as well. The required protection level and enclosure housing are selected for the site conditions and project specification.

What power supply information is needed for a quotation?

Provide the supply voltage, frequency, number of phases and the installation country. Include a load or motor list, rated powers, starting methods and any available single-line diagram. If you have specified components, control voltages or protection requirements, include them. Missing electrical information can be listed as an open item for engineering review rather than assumed.

Can new automation equipment connect to existing PLC and SCADA systems?

We review the existing programmable logic controllers (PLCs), I/O list and communication interfaces. Share the network layout and the signals that must pass between the equipment and plant systems. We then define any PLC programming changes, control responsibilities, data exchange and test conditions. Plant access and any production shutdown must be agreed with the site team. If the production line needs real-time monitoring, list the states, counts and alarms to display. Agree the refresh rate and what operators should see if a device goes offline.

What should I send with an automation project enquiry?

Send a short process description, equipment list and layout. Include the product range, target throughput, installation location and the main problem you want to solve. Existing electrical drawings and PLC details are useful if available. You can submit an enquiry before every detail is ready. Tell us what is still unknown so the engineering team can identify the next checks and define a quotation scope.

Which documents are included at project handover?

The agreed handover package can include electrical drawings, component lists, terminal schedules, test records and operating documents. PLC or HMI backups and training materials depend on the software and service scope. Confirm the document language, file formats and revision requirements before manufacture. This gives the operating and maintenance teams a clear reference for the delivered system.

Can factory automation be introduced in stages?

A staged project can be considered when the process and interfaces allow it. One stage might address product transfer or buffering, while a later stage adds monitoring or production-data connections. The plan needs to account for existing equipment, operator tasks, safety interfaces and installation windows. Each stage should have a defined scope and acceptance conditions so it can be checked before the next change.

Selected customers

Tire & Rubber

  • Goodyear (USA)
  • Pirelli
  • Sumitomo Rubber
  • Cooper Chengshan
  • CST Tire
  • Huafeng Rubber

Automotive & New Energy

  • BMW Shenyang (→ Germany)
  • Evergrande Auto
  • Ford (Vietnam)
  • VinFast (Vietnam)

Semiconductor / FPD

  • TSMC (Shanghai)
  • SMIC (Beijing/Shanghai/Tianjin)
  • Wuhan Hongxin
  • Tianma (Xiamen/Wuhan)
  • CSOT (Shenzhen)
  • UMC (Xiamen)
  • HKC (Sichuan/Anhui)
  • Nanya
  • Royole

Data Center / Internet

  • Huawei
  • Alibaba
  • Foxconn
  • Delta

Power Generation

  • V-POWER (Singapore)
  • V-POWER (Myanmar)
  • ComAp (SE Asia)
  • Trilogy Power Solutions (US→CA)

Rail / Healthcare / Infrastructure

  • Chengdu Metro Line 4 P2
  • Zhengzhou Urban Rail
  • Changhai Hospital
  • Tsinghua Hospital Beijing
  • Chang Gung Hospital Beijing
  • Jishou University
  • Putian / Fuzhou Traffic Police

Contact Topchampion

Building #1, No. 1890, West Zhonghuayuan Road, Yushan Town, Kunshan City, Suzhou City, Jiangsu Province, China

lc-l@topchampion.net

+86-0512-57306212